Commercial moving

Business relocation, from one site to the next

Full relocations between locations, planned around your operations and your downtime.

Plan backwards from opening day

A relocation succeeds or fails on what is working when the doors open. We plan the sequence backward from that: what has to be in place first, what can wait, and what can move the day before.

Both ends matter

The old site has a lease and a handback; the new site has a delivery window and possibly a freight elevator. We ask about both and plan the load around the stricter one.

A plan, not a rate card

The timing follows your plan. For multi-trip or larger moves we lay out the plan with you.

What this covers

Move planning

Sequence and timing built around your operations.

Both buildings

Delivery rules at each site planned in.

Multi-trip moves

Phased plans for larger relocations.

What to tell us

  • Lease handback and access times
  • Delivery window at the new site
  • Order of what must be working first
  • Stairs, elevators and docks

How a move works

  1. Tell us the moveSend the two addresses, what is moving, and any stairs, elevators, gates or tight streets at either end.
  2. We plan the dayWe confirm access, the loading order and the timing, so nothing is left to be discovered on arrival.
  3. Moving dayWe arrive at the time we confirmed and start loading, using the liftgate where there is no dock or ramp.
  4. Loaded, driven, deliveredYour items go from your door to the new address, with the liftgate where there is no dock or ramp.

Questions we get asked

Can you phase a move over several days?
Yes. We plan phased moves with you.
What if the new space is not ready?
Tell us the situation. We plan around the realistic ready date.
Do you serve the whole Bay Area?
Yes. Seventeen cities. See the service area page.

Tell us about your move

Send both addresses and what is moving, and you will get a straight answer about timing and how the move will run.