Commercial moving
Business relocation, from one site to the next
Full relocations between locations, planned around your operations and your downtime.
Plan backwards from opening day
A relocation succeeds or fails on what is working when the doors open. We plan the sequence backward from that: what has to be in place first, what can wait, and what can move the day before.
Both ends matter
The old site has a lease and a handback; the new site has a delivery window and possibly a freight elevator. We ask about both and plan the load around the stricter one.
A plan, not a rate card
The timing follows your plan. For multi-trip or larger moves we lay out the plan with you.
What this covers
Move planning
Sequence and timing built around your operations.
Both buildings
Delivery rules at each site planned in.
Multi-trip moves
Phased plans for larger relocations.
What to tell us
- Lease handback and access times
- Delivery window at the new site
- Order of what must be working first
- Stairs, elevators and docks
How a move works
- Tell us the moveSend the two addresses, what is moving, and any stairs, elevators, gates or tight streets at either end.
- We plan the dayWe confirm access, the loading order and the timing, so nothing is left to be discovered on arrival.
- Moving dayWe arrive at the time we confirmed and start loading, using the liftgate where there is no dock or ramp.
- Loaded, driven, deliveredYour items go from your door to the new address, with the liftgate where there is no dock or ramp.
Questions we get asked
Can you phase a move over several days?
What if the new space is not ready?
Do you serve the whole Bay Area?
Tell us about your move
Send both addresses and what is moving, and you will get a straight answer about timing and how the move will run.